Shift In-charge, Nigeria

Shift In-charge, Nigeria

1 Nos.
45174
Full Time
10.0 Year(s) To 15.0 Year(s)
Not Disclosed by Recruiter
Production / Quality / Maintenance
Plastic/Rubber
Job Description:

This position will have the overall accountability to:

•          Ensure that Production shift Incharge has experience in Blow moulding machines (like Uniloy, Bestar, Tongda, Jagmohan, IBM Victor & CMP machines).Be the dedicated formulation expert.

  • Machine process set-up, minimize rejection/wastage and max. Capacity utilization of machines.

•          Hourly production monitoring based on cycle time & achieve Production Target.

  • Hourly rejection monitoring & minimize rejection daily basis. Record the rejection.

•          Shift charge is responsible for production quality rejection

•          Ensure that pinch-off / damage grinding material is being used on-line production.

•          Ensure that you have been verified Shift RM accountability after complete the shift.

•          Make sure all the machine productions are packing online & the output must match with the physical count

•          Weekly Raw material reconciliation & shift In charge is answerable for any difference

Ensure that Shop floor is well organized based on 5’S management system.

Company Profile

The --- is a diversified conglomerate. Over the past 30 years, --- has made substantial investments and deployed great managerial prowess in diverse sectors to lift the standards of products and living by developing and providing world-class products at locally-sensitive prices while effectively providing platforms for technology transfer to Nigerians and engaging various sections of Nigeria’s local communities through our backward integration programmes to empower local farmers, skilled workers and suppliers.

Apply Now

  • Interested candidates are requested to apply for this job.
  • Recruiters will evaluate your candidature and will get in touch with you.

Similar Jobs

Shift In-charge, Nigeria
"Production Planning", "Quality","Blow moulding machine","Production Monitoring","Shift Planning","Maintenance"